Insight details
To compare Chinese supplier quotations beyond price, first put each offer against the same specification, quantity, packaging, and delivery basis. Mark missing information as unknown, ask for a written clarification, and compare costs only after the important differences are resolved.
The table below is for quotations already received. If the buying requirement itself is not defined, start with how to prepare an RFQ for Chinese suppliers, then return to the responses.
Copy a comparison table before ranking suppliers
Replace the prompts with actual supplier replies and identify the quotation or attachment behind each answer. This is a blank template, not an Alex customer order or a recommendation of either supplier.
| Comparison item | Buyer requirement / common basis | Supplier A: answer and reference | Supplier B: answer and reference |
|---|---|---|---|
| Supplier and quotation | Legal entity, quotation version, date and validity | [fill in] | [fill in] |
| Product specification | Model, material, dimensions, finish and drawing revision | [fill in] | [fill in] |
| Quantity and MOQ | Required quantity by SKU, color or size; applicable price break | [fill in] | [fill in] |
| Unit price | Same currency, unit and tax basis; what is included | [fill in] | [fill in] |
| Packaging and labels | Inner and outer packing, protection, artwork and marks | [fill in] | [fill in] |
| Samples and tooling | Separate charges, revision terms and any agreed credit | [fill in] | [fill in] |
| Production and readiness | Lead-time starting event; packaging and local delivery timing | [fill in] | [fill in] |
| Payment and checks | Deposit and balance triggers; inspection access and timing | [fill in] | [fill in] |
| Delivery and exclusions | Agreed delivery term and named place; local delivery, freight and documents included or excluded | [fill in] | [fill in] |
| Open items and next step | Missing answer, responsible person, response date and decision | [fill in] | [fill in] |
Use “included,” “excluded with a confirmed separate price,” “unknown,” and “not applicable with a reason” consistently. A blank cell is not a zero-cost item, and “included” is not a second charge to add to the total.
Resolve specification and quantity differences first
Check whether both quotations cover the same material, grade, dimensions, finish, accessories, logo, packaging and drawing version. If a supplier proposes an alternative, record it as an alternative rather than quietly comparing it with the requested product.
Compare MOQ by relevant SKU, color, size or packaging option, not only the headline order quantity. Ask whether the offered price applies to your actual buying quantity and whether a smaller trial order changes it. A price for a quantity you do not plan to buy is not the common comparison basis.
Supplier identity and capability still need separate evidence. For that work, use how to check a Chinese supplier before paying a deposit. A tidy quotation is not proof of production ability.
Put costs on the same boundary
Choose the same currency, quantity, unit, tax treatment and cost boundary for the comparison. Ask each supplier to reissue or clarify its offer on that basis where possible. Keep confirmed facts separate from estimates and record any exchange-rate date used.
For a defined comparison boundary, build the total from the applicable quoted items: goods at the agreed quantity, separate sample or tooling charges, required packing or labels, and delivery or other costs not already included. Record whether a sample credit is conditional on a later order; do not deduct a possible credit as though it were already agreed and available.
Do not add freight to an offer that already includes the same freight, or compare a factory-side price with a delivered total without identifying the missing cost and responsibility. Where a charge is unquoted, keep the total incomplete and label it accordingly. Do not fill the gap with a made-up allowance to create a winner.
If the parties use ICC Incoterms® rules, record the chosen rule, named port or place, and version. These rules address delivery tasks, costs and risks; payment and product-quality terms need separate agreement. Use our FOB, EXW, CIF and DAP comparison for the wider explanation rather than inferring a complete offer from a short trade-term label.
Clarify lead time, payment, and inspection together
Ask when lead time starts: after the deposit, sample approval, drawing confirmation, or another stated event. Record what the completion date covers—production only, packed goods ready for collection, or delivery to the agreed point. Keep a supplier's production promise separate from a carrier's sailing or arrival estimate.
Compare deposit and balance-payment triggers, separate tooling or sample payments, and what can be checked before the next payment stage. Do not treat sample approval as automatic authorization to pay. For the sample decision itself, use what to check before approving a sample for bulk production.
Ask whether pre-shipment inspection can be arranged, where, when, and within what agreed scope. “Inspection allowed” without timing may not tell you whether a problem can be reviewed before the balance is due.
Send one clarification request and choose the next action
Group the gaps by supplier and send a short request tied to the quotation version:
Please confirm the attached specification revision and quantity basis. State whether the listed packaging, labels, tooling and delivery items are included, separately priced or excluded. Identify the lead-time starting event, payment triggers and inspection timing. For every unresolved item, provide the missing answer or mark it unconfirmed. Please issue a revised dated quotation or reply against each item; identify any change to price, validity or schedule.
Then record the next decision:
- Ready for a shortlist: the important technical and commercial comparisons are supported; proceed with the relevant supplier checks or sample step.
- Clarification still required: a material cost, requirement, or timing condition remains unknown; keep the ranking provisional and name the missing answer.
- Offer does not fit: a confirmed specification, MOQ, payment condition, or schedule conflicts with the buying plan; record the reason rather than hiding it inside a weighted score.
There is no universal score that makes an unsuitable specification acceptable. Retain the original quotation, each clarification, and the version used for the decision so later changes can be traced.
How Alex Trading Group can help
Alex Trading Group helps overseas buyers compare Chinese supplier quotations, clarify missing details, follow up with suppliers in Chinese, and identify which quotation is ready for the next step through our trade execution support.
If you already have quotation screenshots, supplier links, product photos, target quantity, destination, and timeline, send them for review.
FAQ
Can I choose the lowest unit price if both products look the same?
First confirm the specification, quantity, packaging, included costs, payment and delivery basis. Similar photos do not establish that the offers cover the same product or scope.
What should I do with an unknown delivery or tooling charge?
Ask for a separate confirmed price and its conditions. Keep the comparison total incomplete until the missing item is resolved; do not enter zero.
Should every supplier receive the same clarification questions?
Use the same core buying requirement and cost boundary, then ask each supplier about its specific gaps. Preserve any alternatives as separate offers.
Can Alex Trading Group compare quotations I already received?
Yes. Send the quotations and their versions, supplier links, product details, quantity, destination, and sample status. We can help clarify what each supplier is offering.