Sourcing situation

You are comparing suppliers, quotations, samples, production updates, or shipment next steps from outside China.

What to check

How to review supplier identity and communication quality

Related support

Supplier review and China-side follow-up

Have a supplier link, quotation screenshot, product photo, drawing, payment term, or shipment question? Send what you have and we will help review the next practical step.

A participant handles a blue bag beside pleated material on a meeting table

Insight details

A China supplier quotation guide is useful for one reason: it lets you turn a single number into four columns you can question. Before you compare two prices, split every quote into unit price, one-time charges, costs that thin out as volume rises, and the boundary conditions written around it. A factory's unit price is only material, machine time and setup divided by your quantity — strip away tooling, packing and trade terms and the two numbers on the page have nothing in common.

China supplier quotation guide: what one quote should actually contain

A usable quotation states eight things, and a quote that omits any of them cannot be compared honestly. Look for the unit price, the quantity breaks, the minimum order quantity, the trade term, the packing method, the lead time, the payment terms and a validity date. Buyers often read only the first line, but the other seven decide what you will actually pay.

The order sizes we most often see sit between 5 and 50 thousand USD, which is exactly the range where these fields start to matter. At that scale a packing decision or a trade term can move the final figure more than a few cents on the unit price. If a field is missing, it has not been waived — it has simply been left for you to discover later.

A blank field is a question, not a favour. Send it back and ask the supplier to fill it in before you rank anyone. If you need help framing that request, our page on how to prepare an RFQ suppliers can quote from lists what to attach so the first quote arrives usable.

The unit price is material, machine time and setup divided by your quantity

The number printed as "unit price" is an average, not a rate that stays fixed at every quantity. For a machined part it is the sum of material, machine time and setup and programming, divided across the batch. Setup is paid once, so as the batch grows its share of each piece falls and the unit price drops — but not in a straight line.

That non-linear drop surprises buyers who expect double the volume to mean half the price. Material is bought at different rates at different volumes, and a complex part can carry ten to twenty process steps, each with its own setup. Doubling quantity removes some fixed cost per piece, but it does not remove the time the machine actually spends cutting.

The practical point is to ask which part of the price is fixed and which part scales. A supplier who can tell you that split has costed the part; a supplier who only repeats a single number has guessed at it. Ask for the quantity breaks rather than arguing about one figure.

For a worked explanation of how machining cost is built, the public technical notes from Zhuohang Precision, a Dongguan machining supplier, describe unit cost as material plus machine time plus setup, with 10 to 20 steps on complex parts. We checked that description on 2026-11-27 and recorded it in our fact base; it is one supplier's published method, not an industry rate.

Tooling is a separate line, and your volume decides whether it is worth it

Tooling deserves its own line because it is the one charge that can be avoided entirely. A die or mold is paid to shape the part, and it can be billed once as a separate item or amortized — spread across the units you order. Which method a supplier shows changes the unit price dramatically without changing the total cost of the order.

Whether tooling is worth paying at all depends on the break-even quantity, not on the price of the mold. A more expensive tool pushes the break-even higher because more pieces are needed to recover it; a part that machines slowly lowers it, because the alternative route is already costly per piece. Published figures from plastic mould suppliers put a simple single-cavity P20 mold at roughly 3,000 pieces to break even, while a complex multi-slide H13 mold can need 10,000 pieces or more. Those are illustrations of the mechanism, not a quote for your part.

This is why the same product can be cheaper by machining at 500 pieces and cheaper by molding at 5,000. Neither factory is wrong; they are pricing different volumes. If your order sits in the middle, ask both routes and let the crossover decide.

If the tooling belongs to you, say so in writing and keep the ownership line in the agreement. Sourcing cost models differ on when tooling is charged and who holds the mold, and our note on sourcing cost models explains the common arrangements. For the drawing side, tolerances are often referenced to published standards such as ISO 2768, which gives general tolerances a shared meaning between buyer and supplier.

Six boundaries that make two quotes for the same product incomparable

Two quotes for an identical product rarely differ because one factory is dishonest. They differ because six boundaries were set differently, and each boundary changes what the number includes. Until those six are aligned, the lower number is not the cheaper option.

The six are the trade term, the quantity break, the specification and tolerance, the packing method, whether tooling and inspection are included, and the validity period. A price quoted EXW excludes delivery to a port; a price quoted FOB includes loading on board at origin. The difference is real money, and neither quote is wrong. Our guide to FOB, EXW, CIF and DAP quotes unpacks each term.

The same logic applies to packing. A quoted price may assume a plain inner bag and a master carton, or it may assume a retail box with an inserted manual. Ask which one is priced before you celebrate a low unit cost. Once the boundaries match, our method to compare quotations beyond price gives a table you can fill in directly.

Tight tolerances and finishes add cost before a quote is even asked for

Some of the difference between two quotes was decided on the drawing, before either factory priced it. Tolerance and surface finish are additive costs: a tighter tolerance makes the machine slow down and the inspector check more, and a smoother surface usually means an extra finishing pass. Nothing about them makes production faster.

The tolerance ladder is steep. General machining to ISO 2768-m, or around plus or minus 0.05 millimetres, is the baseline. Tightening to plus or minus 0.01 millimetres needs careful fixturing and checking, and around plus or minus 0.003 millimetres calls for controlled setups and measurement equipment.

Surface finish follows the same pattern. A roughly 3.2 micrometre surface falls out of a normal cut, while 0.8 micrometres usually means grinding or a deliberately slow finishing cut. The figures come from the same Zhuohang Precision technical notes checked on 2026-11-27.

The consequence is simple: calling out the finest tolerance over the entire part is the fastest way to raise a quote without changing the product's function. Mark the precision where function needs it and leave the rest at a general tolerance. That single edit often saves more than a round of price negotiation.

The buyer who compared unit prices and missed the packing boundary

One buyer we worked with shortlisted a supplier purely on the lowest unit price for a line of consumer parts. The quote looked clean and the sample was good. What the buyer did not confirm was how the goods would be packed and which trade term the price assumed.

The factory priced a plain poly bag and an export carton that held far fewer pieces than the buyer expected. The quote also assumed EXW, so delivery to the port and export packing work were billed separately later. By the time the goods were ready, the saved unit price had been absorbed by cartons and origin charges the buyer had not budgeted for.

Nothing in the original quote was false. The buyer compared the only column that was printed and left the others unasked. This is the most common way a cheap quote becomes an expensive order — and it is avoidable with a single clarification round before deposit.

The order to confirm a quote, and what to send to get a usable one

Work through a quote in a fixed order, and you will reach a decision faster than by scanning for the smallest number. First align the boundaries — trade term, quantity, specification, packing — then ask the supplier to mark which lines are one-time and which scale with volume. Only then compare the unit prices.

When you ask for the quote in the first place, attach the specification or drawing, the quantity breaks you are considering, the trade term you want priced, and the packing you expect. A supplier who receives those four things can return a comparable number; a supplier who receives only a product name will return a guess. If you want to take the next step after the quote, our note on how to build a landed-cost sheet shows where duty, freight and quote terms belong.

Keep every clarification in writing and ask for one consolidated reply rather than a stream of separate answers. The single-reply habit prevents the classic problem where two suppliers answer different questions and appear to agree when they do not.

Questions buyers ask before they accept a quotation

How long should a quotation stay valid, and can a supplier change the price after it expires? A validity date should be on the quote. Raw material and currency movements are common reasons a supplier asks to reprice after that date, so treat an expired quote as a starting point rather than a fixed commitment.

Can sample fees and tooling fees be refunded on a bulk order? Sometimes, but only if it was agreed in writing before you paid. Ask the supplier to state on the quote whether these amounts are credited against a later order, and under what quantity.

Why did my unit price barely fall when I doubled the quantity? Because part of the price is machine time and material that scale almost in proportion to quantity, and only the setup portion spreads thinner. Ask which share of the price is fixed before assuming a volume discount.

Should a quotation include a raw material or currency adjustment clause? For long lead times or orders priced in a currency different from the supplier's costs, such a clause is common. Read it as a risk allocation, and ask what index or rate would trigger a change.

A supplier only quotes EXW. Can I ask for FOB instead? You can ask. The supplier may decline if they do not handle export delivery, in which case you price that step yourself; either way, compare all quotes on the same term.

Turn a price into a cost you can act on

A quote is useful when every column maps to a decision you can make — whether to open a mold, which quantity to order, and which boundaries to hold firm. Split it into the four parts at the start of this guide and the number stops being a verdict.

If you would like a second pair of eyes on the lines before you commit, you can request a line-by-line quote review. We will read the quote against the same boundaries and tell you which numbers still need a question.

This article is based on public information and our project experience. It is not procurement, customs or legal advice.

Next step

Have a sourcing question about this topic?

Send the supplier link, product details, quotation, payment term, sample issue, or shipment question. We will review the situation and help clarify the next practical step.

Ask a Sourcing Question

Cookie and privacy settings

We use required cookies for site function and optional cookies for page usage, inquiry support, and advertising measurement.

You can accept all cookies, reject optional cookies, or manage your preferences.